Software Updates:
12/20/12
DataCopy.exe - 1/10/12
Added support for P-DAQdp.
DataList.exe - 12/20/12
ADO compatability Mode re-compile.
DataLoad - 12/20/12
Stopped update to P-Check when error
dialog is displayed.
ADO compatability Mode re-compile.
DataPurg.exe - 12/20/12
ADO compatability Mode re-compile.
DataSync.exe - 12/20/12
Records are sometimes re-updated on Server
to eliminate problems caused by difference in clock
time between Press computer and the Server. Duplicate
records are sent to Primac when re-sending a record
from "EmpLog" after the record was processed
by "DataLoad". Changed "DataSync"
to not re-send "EmpLog" records once they
have been completed by "DataLoad".
Added the ability to purge Stats database table data when the data is not transferred to the server. This was done to purge the PressEvent and PressStats tables when printing P-Admin reports at the press.
ADO compatability Mode re-compile.
DataSyncWip.exe - 12/20/12
ADO compatability Mode re-compile.
DBMaint.exe - 12/20/12
ADO compatability Mode re-compile.
P-Admin - 5/14/12
Changed build of summary files so event
"0060" is recognized.
ADO compatability Mode re-compile.
P-Check- 4/12/12
Fixed errors.
Paperman.exe - 12/20/12
ADO compatability Mode re-compile.
Pressman.exe
- 12/14/12
Added Crew-Change event (0060)
to the ShiftLog to facilitate change-over when employee
arrives late.
Added support for presses which can deliver signatures to either multiple or alternate deliveries.
Fixed End-of-Pallet problem when running sub-jobs with multiple deliveries.
Improved
accuracy of calculating Core Waste when using the
Paper Management system.
Corrected problem whereby Press Stop Event (9010)
is not being written when press is idling while
conveyers are clearing.
Removed Event (0060) from EmpSet and from Shift Detail Report. Event was showing up on report with employee ID as operation code
Removed record update to EmpLog when current entry matches last entry in log. This was done to prevent an update to an EmpLog record that may have already been uploaded by DataLoad.
Added blinking View button to indicate that HOLD's are present in the ShiftLog.
SchLoad1.exe - 12/20/12
ADO compatability Mode re-compile.
SchLoad2.exe - 12/20/12
ADO compatability Mode re-compile.
SchLoad3.exe - 12/20/12
ADO compatability Mode re-compile.
SysCopy.exe - 2/08/11
Added support for P-DAQdp.
SysUpd.exe - 3/08/11
Added support for P-DAQdp.
04/22/10
DataSync.exe - 4/22/10
Changed scan of server database for control records
to 1 minute.
P-Check - 4/6/10
Customized to check ShiftLog HOLDS only 3 days old.
P-Admin.exe - 4/1/10
Fixed errors..
Pressman.exe
- 3/3/10
Added
Speed Graph to Diagnostic panel to display all speed signals
in real-time.
Skid numbers are now generated by signature rather than by pallet. This eliminates duplicate skid numbers when delivering the same signature to more than one pallet. Skid numbers are no longer re-sequenced when setting the pallet quantity to zero.
Corrected problem when using "AutoTicketGen" with "Lifts/Pallet" = 1. Also, when using "AutoTicketGen", system will not automatically generate last ticket for each signature but rather wait until STOP button is pressed.
Fixed timing problems when using lasers in conjunction with Zero Makeready presses.
SchLoad1,2,3.exe - 5/21/09
Fixed errors.
DataLoad.exe - 5/21/09.
Fixed Errors.
DataPurg.exe - 5/21/09
Fixed Errors.
DataSyncWip.exe - 2/9/09
Changed to exit from WIP_UpdatePallet when timing
out due to WIP_DataServer not running..
P-Sched.exe - 1/6/09
Fixed errors.
P-Maint.exe - 1/15/09
Fixed errors.
12/02/08
Pressman.exe
- Version 6.6.1
Pressing
the TARE key on the GSE-675 or GSE-460 causes the scale waste to be
reduced by the number of signatures in the scale. Corrected so the
current scale count is zeroed without affecting the current overall
count. This change only works if the increase in tare weight is more
than 2 pounds.
P-Admin.exe - Version 6.5.14
You must now have update permission as specified in the
"Security.ini" file in order to rebuild the summary databases.
Also, changed program so that total rebuild will not clear summary
tables after log files have been purged.
DS-Pause.exe - Version 6.3.4
Fixed problem whereby DataSync remains suspended if program
is terminated by closing the form rather than pressing the "RESUME"
button.
DataSync.exe - Version 6.4.14
Changed scan of "ShiftLog" from 2 times to 3.
If the "LastMod" indicates no change, double-check by comparing
all fields in record.
DataPurg.exe - Version 6.3.7
Changed to allow Stop Analysis report charts to be seletively
hidden based on the P-Admin.ini file.
Corrected Error #52, "Bad file name or number" when terminating
the program.
P-Check - Version 6.2.0
Changed to different email method.
Pressman.exe
- Version 6.6.0
Added traces to troubleshoot EP210
speed blips.
Added "Hold" logic to momentary contact buttons to ignore noise. To invoke, please contact tech support.
Fixed problem whereby the calculated piece weight was not automatically transferring to the GSE-675 scales.
Added ability to automatically print the Shift Detail report to any network printer, while also allowing it to be manually printed to the PC's default printer. To invoke, modify the Pressman.ini file:
Shift Report Printer = LocalPrinter, NetworkPrinter
Added software funtionality to mirror the use of physical Start/Stop buttons connected to the system. To use these, click the "Good" / "Bad" indicators on the Status screen.
Fixed problem whereby the automatic Job/Form report was erroring out when the local database grew in size. This was caused by to little a delay allowed for the PressStats table to build locally.
DataComp.exe - Version 6.3.3
Corrected program to ensure that it un-pauses all DataSync's.
DataCopy.exe - Version 6.3.4
Corrected program to ensure that it un-pauses all DataSync's.
DataDump.exe - Version 6.3.3
Corrected program to ensure that it un-pauses all DataSync's.
DataPurg.exe - Version 6.3.3
Corrected program to ensure that it un-pauses all DataSync's.
P-Admin.exe - Version 6.5.13
Changed to allow Stop Analysis report charts to be seletively
hidden based on the P-Admin.ini file.
03/03/08
Pressman.exe
- Version 6.6.0
Added the ability to automatically
print employee's time sheet when employee signs off. New parameter added
in [Shop-Floor Interface] section of the Pressman.ini file as in the following
example:
Auto Time Sheet = Yes.
Added ability to disable employee time sheet button on crew tab. Employee cannot display the time sheet. If the "Auto Time Sheet" parameter is set to "Yes", the time sheet will be automatically displayed at sign-off but the "Report" button will be disabled. To allow automatic time sheets to print when signing off, AND to display the "Report" button, 2 parameters are now required in the [Shop Floor Interface section of the Pressman.ini file as in the following example:
Auto Time Sheet = Yes
Manual Time Sheet = Yes
Added support for
GSE-460 and GSE-675 scales. GSE-675 can only be used on single delivery
systems since only one piece weight can be specified for all floor scale
platforms. Both of these scales can be purchased with an onboard ethernet
adapter.
Corrected OVERFLOW error in DrawYAxis and DrawGrid routines.
Changed to pass M/R waste to P-Status to allow calculation of Run Waste %.
Added a "Part Number" input field on the Job folder for RRDonnelley. The Part number is subsequently printed on Load Ticket.
Added ability to enter into Running
mode when the press reaches a pre-defined speed. New parameter added to
the [Constants] section of the Pressman.ini file as in the following example:
Press Auto Run Speed = 10000 (Imp/Hr)
Added ability to enter into Running
mode after X number of impressions are produced without throwing product
into the waste bin. New parameter added to the [Constants] section of
the Pressman.ini file as in the following example:
Auto
Start Count = Yes, 1000, 500 (Yes to turn feature on, post makeready Imp/Hr,
post down Imp/Hr)
P-Status.exe - Version 6.3.4
Replaced "total
waste" column with "M/R waste" and added a new column to
display "Run Waste %.
DataSync.exe - Version 6.4.13
Changed "Remote Pause" determination to interrogate
contents of "DS-Pause" file rather than test for locked file.
When paused, the "DS-Pause" file will contain the name of the
program that initiated the pause. When the pause is not in effect, the
file contains a blank in the first character position.
DataComp.exe - Version 6.3.3
Changed to write the program name to "DS-Pause" text
file when suspending "DataSync". This change was made in conjunction
with the new DS-Pause.exe and the new DataSync.exe.
DataCopy.exe - Version 6.3.4
Changed to write the program name to "DS-Pause" text
file when suspending "DataSync". This change was made in conjunction
with the new DS-Pause.exe and the new DataSync.exe.
DataDump.exe - Version 6.3.3
Changed to write the program name to "DS-Pause" text
file when suspending "DataSync". This change was made in conjunction
with the new DS-Pause.exe and the new DataSync.exe.
DataPurg.exe - Version 6.3.3
Changed to write the program name to "DS-Pause" text
file when suspending "DataSync". This change was made in conjunction
with the new DS-Pause.exe and the new DataSync.exe.
P-Check - Version 6.2.0
Changed to allow the email "From" property to be edited.
Changed to allow program to check multiple plants via the same server. This change will also display the "Company" name on the main screen, and the company name on any email messages. A new section and parameter was added to the P-Check.ini file accomidate as in the following example:
[Company]
Company=ABC Printing
05/08/07
Pressman.exe
- Version 6.5.31
Added
the ability to display total signatures discarded in each bin. To use this
feature set parameter "Show Scale Total = Yes" in "Pressman.ini"
file.
Changed to attempt to re-connect to LED sign after connection failure. This will be attempted every 2 minutes after a failure. Error messages will be written to trace log but no message will be displayed to operator.
Added interface to JDFSched to view and select a form to be run.
Added Ethernet support for Piece Weight and Waste Scales. Changed first scale parameter in CFG file to STA/111.222.333.444:PORT.
Added logic to blink Scale Unstable light (to warn pressman) when communication link is broken between scale and TNET controller.
Removed redundant noise suppression logic (speed calculation) when using EP210 devices for counting.
P-Status.exe - Version 6.3.3
Fixed problem
with percent complete graphic when due to counting problems, percent complete
exceeds 100.
P-Admin.exe - Version 6.5.13
Updated style
and added Tree Menu.
Changed report selection from Machine
Number to
SchLoad1.exe - Version 6.4.5
Modified to
update the SchLoad.chk file to be used by P-Check for monitoring purposes.
SchLoad2.exe - Version 6.4.5
Modified to
update the SchLoad.chk file to be used by P-Check for monitoring purposes.
SchLoad3.exe - Version 6.4.5
Modified to
update the SchLoad.chk file to be used by P-Check for monitoring purposes.
DataPurg.exe - Version 6.3.5
Modified to
update the DataPurg.chk file to be used by P-Check for monitoring purposes.
DataLoad.exe - Version 6.4.5
Automatically
retries on an error if there is no user response. This allows the program
to continue if the error was not fatal and the program is not being monitored.
Errors are recorded in the dataload.txt file for later review.
Modified to update the DataLoad.chk file to be used by P-Check for monitoring purposes.
DataSync.exe - Version 6.4.11
Add ability
to run "DataCopy" automatically on the first Tuesday of every
month to keep the size of the Access databases in tact.
Added new parameter to "DataSync.ini" to allow "DataSync" to restart automatically (Auto Restart = Yes) after displaying an error message for 15 seconds. The restart is done by a new program (Restart.exe) which must be present in the same directory as "DataSync". "SysUpd.ini" has been changed so that "Restart.exe" is copied when running "SysUpd".
P-Check - Version 6.1.2
Changed to default
to 10 minute intervals for more critical time sensitive apps.
Changed to send a Daily Report every weekday morning at 9AM.
Changed to clear out Log screen at 4AM.
07/10/06
Pressman.exe
- Version 6.5.29
Added
the ability to use the “Scale in Motion” indicator on GSE scale to determine
stability rather than averaging the last 3 readings.
Added Auxiliary Delivery Count so that either laser scanner can be used when running a single delivery on a 2 delivery press.
Added P-DAQ LT support to P-DAQ. Screens and menus changed. Security file determines if P-DAQ LT has been licensed.
Added support for StockCode table so Roll/Skid information can be downloaded and used by P-DAQ. This eliminates the need to query for information over the network when running Paper Management.
Corrected problem whereby the “SET SCALE WASTE” does not work properly. This problem only occurs when the “Delivery Waste Scale” parameter in the “Pressman.cfg” file does not contain the delivery number in the last parameter.
P-Admin.exe - Version 6.5.11
Fixed problem
with Log reports that occured when one or more selected presses contain
no data for current time period.
Also corrected problem with scroll bar.
SchLoad1.exe - Version 6.4.5
Changed to remove
any control characters from description fields.
SchLoad2.exe - Version 6.4.5
Changed to remove
any control characters from description fields.
SchLoad3.exe - Version 6.4.5
Changed to remove
any control characters from description fields.
DataLoad.exe - Version 6.4.5
Added the cost
center to the dataload parameters to facilitate testing on one press at
a time.
Added division to the "Job" download to ensure that the priority download sends jobs to the correct division.
P-Maint.exe - Version 6.3.3
Changed program
to delete records from Remote.mdb rather than just setting the DeleteFlag.
01/16/06
Pressman.exe
- Version 6.5.27
PAPER
MANAGEMENT: Added a new function on the rollstand station to report paper
waste that occurs while paper is in process of being used. This is generally
for feeder waste on sheet-fed presses, however, this may be used for roll
stock as well. This waste is lumped in with slab waste on associated reports.
PAPER MANAGEMENT: Altered paper weight calculation based on paper type by using different basis size for Cover, Book, Index and Tag stock.
PAPER MANAGEMENT: Corrected a number of problems associated with using an Input Sheeter on a sheet-fed press.
Changed the ordering of forms when multiple forms are open at the same time. Forms are ordered into layers, minimized with main screen and moved with main screen when in their docked position. Moveable forms may be moved independently and then re-docked by moving back to their original position.
Employee name was being entered into PalletLog. Corrected to place Employee ID instead. This was OK prior to April 2005. Employee name will still print on Load Ticket.
Enabled "Set Scale Waste" option with multiple delivery press. This also works when multiple deliveries share one scale. The "Auto Set Scale" option can now be used in this situation to set scale waste when M/R is complete.
Added "Auto Start Run" option to use inactivity of waste scale to trigger run mode. When the difference between the gross count and the scale waste is equal to the parameter specified, the system automatically places the press into a run status. The second parameter is used during a restart in the same manner.
Example: Auto Start Run = Yes, 1500, 500
When using GSE scales, you can now use the Motion indicator on the scale to derive stability rather than average the last 3 reading. This serves to make the system more responsive to changes in signature waste without having to increase the poll rate. Parameter is "Use Scale Motion = Yes" and should be placed in the "Pressman.ini" file. Scales must be re-programmed to activate this change.
P-Admin.exe - Version 6.5.10
Report display
horizontal scroll bar was not working when screen resolution was set to
800 x 600. This has been fixed.
Erratic behavior of vertical scroll bar. Page was being skipped when attempting to go to the next or previous page. This has been fixed.
Manual entries in MR-1 and MR-2 could be categorized as downtime in the PressStats table and on Shift Summary Report. Corrected this to compare op-code in manual entry to those flagged as MR-1 or MR-2 in the OperCode table.
SchLoad1.exe - Version 6.4.4
Added "SchLoad1.log", "SchLoad2.log" & "SchLoad3.log" trace files for debug purposes. Files are stored in Local Base Path.
SchLoad2.exe - Version 6.4.4
Added "SchLoad1.log", "SchLoad2.log" & "SchLoad3.log" trace files for debug purposes. Files are stored in Local Base Path.
SchLoad3.exe - Version 6.4.4
Added "SchLoad1.log", "SchLoad2.log" & "SchLoad3.log" trace files for debug purposes. Files are stored in Local Base Path.
08/10/05
Pressman.exe
- Version 6.5.23
Add
the ability to automatically set the scale waste to P-DAQ waste at completion
of M/R. This can be done for sheet-fed presses when it is not always feasible
to discard all MR waste into the waste bin. This change ensures that waste
counts are syncronized, and that MR waste count is accurate even if there
are problems with the piece weight calculation. To activate this feature,
add the following to the Constants section of the Pressman.ini file: Auto
Set Scale = Yes
Add ability to prompt for a password when operator attempts to enter selective Idle codes in the Shift Log.To activate this feature, add the following parameters to the Constants section of the Pressman.ini file:
Fixed Shift Detail Report: Gross count was incorrect on last line when printing report after shift change if shift change is on hold.
P-Admin.exe - Version 6.5.8
Changed all
Paper reports to allow viewing of Paper Usage chronologically.
Added the ability to send reports in PDF format via email. This feature requires the use of third party software called PDF995. To obtain this software, visit PDF995 on the web at www.PDF995.com.
The new version of P-Admin requires an ActiveX control named MSMAPI32.OCX. Download the file and put it in the System32 directory on each client machine.
Problem with scrollbar on reports greater than 350 pages has been fixed. P-Admin can now display a report up to 3500 pages in length.
DataDump.exe - Version 6.3.1
Changed the
program to automatically send the CFG and INI files along with data for
troubleshooting purposes.
06/16/05
Pressman.exe
- Version 6.5.21
Signature
quantity was not being updated when manually entering a new job. Fixed.
Stops during MR-2 were not showing up in the Multi-Stop dialog box. Fixed.
P-Admin.exe - Version 6.5.7
Added ability to use PageUp, PageDown, and arrow keys to scroll through reports.
05/16/05
Pressman.exe
- Version 6.5.20
Changed
to suppress the "Delivery" prompt on the delivery station terminal
when the press has only one delivery.
P-DAQ can be configured to send Labor, WIP, and Paper transactions to Primac without the need to route the data through the NDC-Plus SFDC system. Click to view / download the installation instructions for this bypass.
P-Admin.exe - Version 6.5.7
Replaced Microsoft
Print Dialog with home grown version as the Microsoft print dialog does
not work properly.
When printing automatic Production Detail by Form Report, it appears that the Shift Log was summarized before all data was written. Added a 5 second delay when running in background mode to ensure that all Shift Log data has been updated before the report is to be printed.
Added new "Paper Usage by Date" report. "PaperStats" table was changed so user must run "Update.sql".
Modified system so that Stop Analysis reports can be run by crew in addition to by shift.
When specifying valid crew members in the "P-Admin.ini" file, the operator name is displayed in addition to the operator ID.
Added parameter for "Company ID" in the "P-Admin.ini" file so that minor changes to reports can be made for a specified customer without impacting others.
Added ability to acquire reports based on four 12-hour shifts per week.
DataLoad.exe - Version 6.4.3
Converted the
programs from DAO to
SchLoad1.exe - Version 6.4.3
Converted the
programs from DAO to
SchLoad2.exe - Version 6.4.3
Converted the
programs from DAO to
SchLoad3.exe - Version 6.4.3
Converted the
programs from DAO to
DataSync.exe - Version 6.4.9
Program was
continually downloading Remote Database tables when an entry was found in
the Control table. This problem was caused by failure to delete records
from Control table. This has been corrected.
03/23/05
Pressman.exe
- Version 6.5.18
Added
parameters to Pressman.ini file to allow the user to control when updates
are distributed to each press. This allows the updates to be installed when
local IT and NASTech support staff are available for troubleshooting. Multiple
days of the week can be specified as well as a window of time to allow the
update. For example:
Update Days = "MON,TUE,WED,THU,FRI"
Update Times = "08:00 - 12:00, 13:00 - 16:00"
Added an error message if operator attempts to print another report before the previous report in completed.
P-Admin.exe - Version 6.5.5
Trying to run
more than 1 report at a time at the press caused an error. Modified to lock
file "PA-LOCK.TXT" when running in background mode. P-DAQ checks
this file lock before attempting to execute P-Admin a second time while
it is processing a prior request. A warning will now be displayed to force
the operator to wait for the first report to process before requesting a
new report.
02/28/05
Pressman.exe
- Version 6.5.16
Getting
error 3167 - (Record is deleted) when printing Shift Detail Report. Delayed
scanning of ShiftLog to prevent deleting records from EmpLog when Report
form is open.
Getting SpeedTimer(120-1) error when Paper Management is initially installed and then removed from "Pressman.cfg" file. Changed program to clear paper definition data left behind in "PaperDef" table and "Recovery.dat" file.
Added ability to print a shift report at end of each shift. New parameter added to "Pressman.ini" file:
Shift Report = "Yes,Auto,ProdDetailByPress,Detail"
Shift Report = "Yes,Auto,ProdAnal,Summary"
Shift Report = "Yes,Auto,ShiftSum,Detail"
Report type (parameter 4) may be "Summary" or "Detail"
If press is stopped after "Count Complete", the system creates a "Wash-Up" entry in the "Shift Log". If the press is then restarted to produce additional good product, P DAQ does not allow counting of good product. Modified system to create "Restart Running", "Count Complete" and "Wash-up" entries in the "Shift Log".
Getting wrong customer name on Load Ticket when job data is not present in "JobSched" and "Job" tables. Changed program to check "JobStats" table first. Corrected potential problem which could cause the wrong "JobStats" record to be updated while P DAQ is running. This would most likely show up as having incorrect data on the performance charts.
When using Laser Scanner or Product Tracking, signatures on conveyor are not being included in good count. Also, when running Zero M/R jobs, Load Tickets are short by the number of signatures on conveyor. Corrected both problems by including signatures on conveyor in good count. If signatures on conveyor are dumped, job may still end up short.
Added ability to use Piece Weight Scale connected to TIM2B. The Piece Weight Scale can automatically set piece weight on an associated waste scale. This option eliminates the TT4, thereby reducing cost when using a single scale. When more than one delivery is present, a separate piece weight scale may be required which could be more expensive than sharing a single scale connected to a TT4.
DataLoad.exe - Version 6.4.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
P-Sched.exe - Version 6.4.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
P-Maint.exe - Version 6.3.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
SchLoad.exe - V
SchLoad3.exe - Version 6.4.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
DataPurg.exe - Version 6.3.4
Automatically
add purge data for "Control" table if not present in the "DataPurg.ini"
file.
ersion 6.4.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
SchLoad2.exe - Version 6.4.2
Modified the
program to update the Control table when changes are made to tables in the
Remote database. Changes will be downloaded to the press immediately.
12/13/04
Pressman.exe
- Version 6.5.10
Stacker
Dialog and Pallet Dialog were not using the edit criteria defined in the
program or in the edit section of the "Pressman.ini" file. Corrected
this.
Changed to allow "Lift Size" and "Lifts Per Skid" to be overridden by specifying either or both entries in job schedule. If a value is not specified, the default value from the "Pressman.ini" file will be used.
Rewrote job selection and entry interface. Users will be promped for required data using a more comprehensive method.
SUB JOBS: Added new option to Sub-Job parameter to the Pressman.ini file to prevent Primac defined sub-jobs from loading into P-DAQ if required:
Sub-Jobs = Yes,Auto,Load OR...
Sub-Jobs = Yes,Auto,NoLoad
SUB JOBS: Added new parameter to eliminate master job from sub-job list if required. Load Master Job = No
10/24/04
Pressman.exe
- Version 6.5.8
Changing
job quantity while P-DAQ is in Start mode is not being recognized.
When waste scale bin is removed, fixed unstable light remaining lit.
Shift date not being adjusted for RunWaste table. Fixed.
Fixed comments missing from Shift Detail Report when entered on or shortly after the sign-on entry in the Shift Log.
P-Admin.exe - Version 6.5.4
Fixed P-Admin
not running in AUTO mode with screen locked, or with no user logged on the
server.
Added new Paper Usage By Press report.
SchLoad1.exe - Version 6.3.2
The program
was locking up if scheduled to run when not logged on.
SchLoad2.exe - Version 6.4.1
The program
was locking up if scheduled to run when not logged on.
SchLoad3.exe - Version 6.4.1
The program
was locking up if scheduled to run when not logged on.
DataPurg.exe - Version 6.3.3
The program
was locking up if scheduled to run when not logged on.
DataLoad.exe - Version 6.4.1
The program
was locking up if scheduled to run when not logged on.
08/27/04
Pressman.exe
- Version 6.5.7
Speed
Timer Error (100) Divide by Zero corrected.
P-Admin.exe - Version 6.5.3
Cosmetic change
to Ink Reports.
DataComp.exe - Version 6.3.2
Changed to force
a DataSync pause by the individual machine to prevent an erroneous Administrative
Pause in DataSync.
DataCopy.exe - Version 6.3.3
Changed to force
a DataSync pause by the individual machine to prevent an erroneous Administrative
Pause in DataSync.
DataLink.exe - Version 6.3.2
Changed to force
a DataSync pause by the individual machine to prevent an erroneous Administrative
Pause in DataSync.
DataPurg.exe - Version 6.3.2
Changed to force
a DataSync pause by the individual machine to prevent an erroneous Administrative
Pause in DataSync.
DataSync.exe - Version 6.4.7
Changed to force a DataSync pause by the individual machine to prevent an erroneous Administrative Pause in DataSync.
DS-Pause.exe - Version 6.3.2
Changed to force
a DataSync pause by the individual machine to prevent an erroneous Administrative
Pause in DataSync.
08/23/04
Pressman.exe
- Version 6.5.6
Add
the ability to invoke "DataCopy" between forms when one or more
of the database structures has changed. This feature is controlled by a
parameter in the "DataSync.ini" file:
Auto Data Copy = Yes
Expanded the number of Zero M/R jobs that may be entered at one time from 8 to 99.
Broke the association between Ink Flow Meters and press color units. Ink colors are defined in "Pressman.cfg" file in new "Ink Meters" section.
Forced orderly shutdown when terminating for the purpose of installing new version of software or executing "DataCopy".
Modified Ink Tracking to track and display ink meters rather than color units on the mainscreen.
P-Admin.exe - Version 6.5.3
Corrected program
not functioning properly in "AUTO" mode.
Corrected not finding matching record due to problems matching "Time" column. Changed program to search through records for match on "Time" column rather than use "Find" command.
Corrected error during Re-Build. Error indicates a problem with a quotation mark.
P-Status.exe - Version 6.3.3
Corrected error
when minimizing Status Screen.
DataCopy - Version 6.3.2
Add ability
to execute automatically so that database structure can be updated automatically
between forms.
DataSync.exe - Version 6.4.6
Added the ability
to initiate "DataCopy" when a new version of "P-Base.mdb",
"R-Base.mdb" or "S-Base.mdb" is downloaded from the
P-DAQ server. Process is initiated by writing "DataCopy.txt" file
containing the database(s) downloaded. When starting a new form in P-DAQ
and the "DataCopy.txt" file is present, P-DAQ executes DataCopy.
A new parameter has been added to the "DataSync.ini" file to activate this feature. (Auto Data Copy = Yes)
07/14/04
Pressman.exe - Version 6.5.1
Added "Routing Code" selection from drop-down list and new Load Ticket Format for Von Hoffmann. A new table (RoutingCode) has been added, therefore, "DataCopy" must be run at all presses and "Update.sql" must be executed to update SQL Server database. This table must be populated using "P-Maint" to utilize this new feature.
Added ability to print Job Report manually or automatically. This feature required version 6.5.1 of P-Admin. The new parameter in the "Constants" section of the "Pressman.ini" file is as follows.
Corrected problems with Run Waste Tracking routine. The key for RunWaste table records has changed, therefore, "DataCopy" must be run at all presses and "Update.sql" must be executed to update the SQL Server database.
P-Admin.exe - Version 6.5.1
Speed of re-build
increased by a factor of eight by modifing the program to utilize
Modified to allow reports to be run in background using "Report" command and "Report.ini" file. This will allow P-Admin reports to be run and printed seletively using buttons from Press Module at Press Computers.
Corrected Job Detail by Form Report. "Pressman.exe" has been changed to allow printing of "Job Detail by Form" report.
P-Status.exe - Version 6.3.2
Added parameter
to P-Status.ini prevent automatic sizing of Summary Status window since
this causes an error when using Microsoft Terminal Server.
P-Maint.exe - Version 6.3.1
Added "RoutingCode"
table support to P-Maint.ini".
DataSync.exe - Version 6.4.5
Speed up the
upload to the server by replacing "FindFirst" with OpenRecordset.
Speed up processing by changing database access from DAO to
Fixed database locks not being released. Modified program to open databases in read-only mode where possible. Also, closed all databases upon program termination.
Changed program so that when performing a copy, records not present on the server are always copied irregardless of the table name.
Added automatic initiation of scan after time delay. Changed terminate dialog box to clarify button definition. Used to ensure that DataSync is always running.
05/13/04
Pressman.exe
- Version 6.4.4
Enhanced
roll stock speed calculation (Paper Management).
Changed Shift Detail Report to Print crew members.
03/25/04
Pressman.exe - Version 6.4.1
Added Multi-printer support. A different printer may be specified for each print function...
A different printer may be specified for each delivery...
A different printer may be specified for each rollstand.
Conveyer is emptying very slowly when signatures are put on conveyer below cutoff speed and then press is stopped. Corrected to empty at specified minimum conveyer speed.
Changed program to allocate bindery spoilage proportionately across sub-jobs when scheduled quantity exceeds total sub-job quantity.
P-Sched.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
P-Status.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
SchLoad.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
SysCopy.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
SysUpd.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataDump.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataLink.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataList.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataLoad.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataPurg.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
P-Maint.exe - Version 6.3.1
Changed Security
to allow User Names with embedded spaces.
DataComp.exe - Version 6.3.1
Eliminated "Pressman.mdb"
and "Bindery.mdb" Missing Table errors when using SQL Server.
Changed Security to allow User Names with embedded spaces.
DataCopy.exe - Version 6.3.1
Erroneous error:
"Cannot copy P.mdb" occurs if an error occurs when re-linking
databases. Changed to ignore re-link errors. Changed Security to allow User
Names with embedded spaces.
Changed Security to allow User Names with embedded spaces.
DataSync.exe - Version 6.4.1
Changed Security
to allow User Names with embedded spaces. Provide mechanism to perform Software
Update on a designated press or group of presses using "Update.ini"
file in Shared directory. Parameter is:
Production Detail by Form Report - Getting different results on bottom half of report. Problem traced to inadvertently selecting multiple jobs by typing a job number for the Job Summary Report and then entering a different job number for the Production Detail by Form.
Fixed program to eliminate problem. Manual Entry not being recognized if entered after Event 2050 (Wash-up). This showed up when operator added an Idle entry after the press was stopped but before pressing the STOP button.
11/17/03
Pressman.exe
- Version 6.3.21
Op-code
was not showing up on Shift Detail Report when manual entry is made following
event 0094 or 0096 and idle time is not being reported to SFDC.
When running ganged jobs, job numbers are not printing on Shift Detail Report. Changed standard report to print job numbers on multiple lines. This change requires running DataCopy at the press.
Corrected pattern match edit routine to work with sequences of more than 9 characters of a specified type. Allow single quote after equal sign if within double quotes.
[PAPER MANAGEMENT SUB-SYSTEM] Delay initial diameter calculation for at least 5 seconds. Program will keep track of impressions run off roll and then calculate the original diameter of the roll.Add sheet stock support. Allow input of paper length and use this for piece weight calculation etc.Allow tracking of roll stock by mill roll ID.
Changed screens to allow up to 24 characters to be entered. Screens changed so only one roll number is displayed.
DataSync.exe - Version 6.2.9
Added additional
trace messages to DataSync.log file to facilitate debug.
11/04/03
Pressman.exe
- Version 6.3.20
Corrected
Subscript-Out-of-range problem when clicking on unused pallet graphic.
Added logic to support P-Status display of M/R operation and downtime reason when available. This additional information is displayed on P-Status detail screen.
DataSync.exe - Version 6.2.8
Eliminated potential
overwrite of TranLog after Status set to COMPLETE by SFIS.
Re-transfer of data if LastMod date is within (Freq + 60) seconds of last scan.
Sped up transfer to SQL Server by reducing size of SQL Server recordset.
P-Status.exe - Version 6.2.1
Changed to display
M/R operation description and downtime reason when available.
This additional information is displayed on P-Status detail screen.
10/03/03
Pressman.exe - Version 6.3.19
Changed to allow
a pressman to be relieved by another pressman on the same shift. The system
prohibited this since two pressman could not be signed on to the same shift.
This change allows the pressman's employee number to be changed on the crew
tab. When accepted, the first pressman is automatically signed off and the
new pressman is signed on.
09/21/03
Pressman.exe
- Version 6.3.18
Added
the ability to display a warning message when using a floor scale and the
operator does not perform an actual piece weight calculation. This feature
is controlled by a new parameter in the Constants section of the "Pressman.ini"
file. The parameter is defined as follows:
Piece Weight Warn = 500,"Derive Actual Piece Weight"
This parameter instructs P-DAQ to display the specified message if 500 good impressioins have been produced and the operator has not yet performed an actual piece weight calculation. The count can be any positive number where zero is the default and prevents the message from being displayed. The message is optional and the default is what is shown above.
09/18/03
Pressman.exe
- Version 6.3.17
When op-codes were added or changed on the server and downloaded to the
press, the changes were not showing up in drop-down list until Pressman.exe
was closed and re-started. Modified the program to refresh the list prior
to displaying, so that additions and changes are reflected in the list immediately.
P-Admin.exe Version 6.2.7
Sped up the
building of the InkStats and PaperStats tables. This resulted in faster
display of ink and paper reports.
08/19/03
Pressman.exe
Version 6.3.16
Added
several new fields to the JobStats table to record the calculated impression
weight, the impression weight being used, and a flag to indicate whether
or not an actual piece weight measurement was performed.
08/08/03
Pressman.exe
Version 6.3.15
Corrected
problem when running a "Ganged Job" and a manual entry is made
in the ShiftLog. The time prior to the manual entry is sent to Primac with
the main job number rather than those specified for each sig.
Corrected potential "Duplicate Record" error when a manual entry is made in the ShiftLog and the time is changed and then changed back to the original time.
07/23/03
Pressman.exe
Version 6.3.14
Added
a new parameter to the "Constants" section of the "Pressman.ini"
file.
The new parameter (Password = ??????) must have a value which is 5 or 6 digits in length. The password is encrypted so that viewing the parameter does not reveal the true password.
When a password is defined and the parameter "Force Form Change = Error" is present, attempting to start a form that has already been run will cause the system to prompt for the password. When the correct password is entered, the form can be re-rerun without change. This will enable the form to be re-used.
07/10/03
Pressman.exe
Version 6.3.13
Beginning
9/1/03, change "Force Form Change" default from "warn"
to "error".
Corrected problem with switches on switch boxes not functioning with multi-delivery configuration file.
07/08/03
P-Admin.exe
Version 6.2.6
Converted
Ink reports from
Added partial rebuild capability to Paper Stats table. Changed Net Yield calculation on all reports to include wash-up time along with run time and down-time.
06/10/03
Pressman.exe Version 6.3.12
Added the ability
to specify ganged job numbers for Zero M/R jobs.
06/02/03
Pressman.exe
Version 6.3.11
If
P-DAQ is terminated between midnight and the beginning of the first shift
of the day and then re-started later that day, the automatic generation
of missing shift Change Events in the Shift Log may fail. This potential
problem has been fixed.
05/28/03
Pressman.exe
Version 6.3.10
"Delivery
Zone" parameter error in multi-configuration environment when Delivery
Zones are specified in the "Pressman.cfg" file. This problem has
been fixed.
05/27/03
Pressman.exe
Version 6.3.9
If the pressman signs off and back on during the shift, the Shift Detail Report was incomplete. This problem has been fixed.
05/20/03
Pressman.exe
Version 6.3.8
Changed
Comment button on Shift Log dialog box to a Check Box to avoid problems
with Wingdings font.
Pressman.exe Version 6.3.7
When manually
changing the status of a Sign-on or Sign-off entry in the ShiftLog, the
system would sometimes plug an OperCode into the transaction. This could
possibly cause the ShiftDetail Report to show the wrong Net counts at the
beginning of the shift. This condition could also be reflected in Primac.
Since these transactions are ignored in the reporting system, the P-DAQ
reports were not affected.
Manual Entry could be incorrect if after selecting a row in the shift log and prior to pressing the ADD button, a new record is added to the Shift Log. The added entry could be a Shift Change, Press Stop, Count Complete etc.
Changed form selection from JobSched table to use Job, Form, Run, Rerun rather than sequence #.
05/09/03
Pressman.exe
Version 6.3.6
Disabled
the ability to change Oper Codes from the ShiftLog "Detail" screen.
05/08/03
Pressman.exe
Version 6.3.5
Added
support for Zero Makeready presses. To invoke Zero M/R An outline to the
proceedures regarding Zero M/R Jobs is available in the UserGuide and in
the P-DAQHelp system at the press.
P-Admin.exe Version 6.2.5
Fixed problems
with reporting system, waste numbers for Shift level reports did not match
the waste numbers for Opcode related reports. Once the new program is installed,
a rebuild is necessary to correct previous reports. If you would like to
rebuild your data, contact us for help. Also added in this version is the
capability to rebuild data from a specific date.
04/12/03
Pressman.exe
Version 6.3.4
Modified
the program to change the Crew ID to lead pressman's ID on the sign-off
transaction in the Shift Log. This corrected problems with timesheets.
04/10/03
Pressman.exe
Version 6.3.3
Modified
the program to process the Sign-off event in shift log when on hold.
03/22/03
Pressman.exe
Version 6.3.2
Added
ability to invoke P-DAQHelp facility via the View menu. New parameter ("Help
Link")added to Constants section of "Pressman.ini" file.
To invoke refer to: "Chapter 4 - Main Screen / Tutorial" section of the User Guide, or, Download instructions from here.
Added parameter in the "ShopFloor" section of the Pressman.ini file called "Report Idle Time". This parameter determines weather the "Default Idle Code" gets transferred to the cost accounting system. This was done automatically in previous versions. The default is No. If you want the Idle code to be transferred to Cost Accounting, you MUST enter the following parameter in the Pressman.ini file. Report Idle Time = Yes
03/02/03
Pressman.exe
Version 6.3.1
Changed
blanket wash delay logic to take conveyer signatures into account. This
enables the blanket wash delay to operate correctly when the press has multiple
conveyers of differing lengths. Also added the capability to turn the counters
back on after a specified number of signatures have been dumped after a
blanket wash. In the Pressman.ini file, the first number represents the
number of impressions needed to deliver the first bad signature from the
last color unit to the end of the folder, the second button represents the
number of impressions before the counters are turned back on. The second
number may be left blank. To invoke, enter the following into the Pressman.ini
file for each press:
02/25/03
Pressman.exe
Version 6.3.0
Re-wrote
zone control code to emulate actual conveyer motion. Added new parameter
to the Pressman.ini file to define the minimum conveyer speed when the press
stops. Users will notice that P–DAQ will continue counting after the press
stops. The system will stop counting when the last signature on the conveyer
is delivered to the stacker.
Corrected problem, operator can now add manual entry after "System Stopped" and "System Reset" events.
Added ability to send non-chargeable entries to Primac for "System Stopped" and "System Reset" events. Use "Default Idle Code" parameter defined in the Pressman.ini file to specify the op-code to be sent.
Corrected problem on Shift Detail Report caused by EmpLog table entries becoming out of sequence.
02/16/03
Pressman.exe
Version 6.2.9
When
using a Laser Scanner to count good signatures, reduce M/R waste based on
signatures on conveyer. The conveyer signatures will be treated as run waste
until the press stops. These signatures will then be counted as good thereby
reducing the waste.
Added parameter driven warning message when pressing STOP button when net count < 100% and there are signatures present in the stacker or on the pallet. Message reads "Incomplete Lift/Pallet, please adjust or end pallet". The options are: "Ignore"- used when aborting the form, and "Cancel", used to undo the STOP request, allowing the sigs in the stacker to be put on the pallet and the pallet to be ended, thereby producing a load ticket. To invoke, enter the following into the Pressman.ini file for each press:
02/10/03
Pressman.exe
Version 6.2.8
Added
a warning message when starting a form that has already been run. The form
is considered previously run if MR-2 time is present. This option may be
turned off or force error under parameter control. The options in the Pressman.ini
files are as follows:
Force Form Change = yes (default)
Force Form Change = no
System will now automatically purge EmpLog table data after 14 days when the table is not being transferred to the server by DataSync.
02/05/03
Pressman.exe
Version 6.2.7
Added
ability to send signatures rather than impressions to Primac and the Shift
Detail Report. To invoke use "T-SIGS, G-SIGS, W-SIGS and N-SIGS"
in the OperData1 column of the OperCode table rather than "TOTAL, GROSS,WASTE
and NET" parameters.
01/31/03
Pressman.exe
Version 6.2.6
Changed
ScanShiftLog routine so subsequent updates to a record cannot have the same
LastMod date. This was done to eliminate erroneous entries in the ShiftLog
on the server with a "HOLD" or RELEASE status.
01/30/03
Pressman.exe
Version 6.2.5
**
System Reset ** entry in ShiftLog may be incorrect if corresponing ** System
Stopped ** entry is not present. This can happen when a form is aborted
rather than completed and a shift change occurs.
01/19/03
Pressman.exe
Version 6.2.4
Added
the ability to automatically remove manual entries and press stops with
elapsed time less than n seconds. To invoke, enter the following into the
Pressman.ini file for each press:
Stop Minimum Time = n (the number of seconds)
01/13/03
Pressman.exe
Version 6.2.3
Changed
"Press Cutoff Speed" parameter. The first number represents the
minimum (Turn On) speed which must be reached by the press in order to be
considered running by P DAQ. (Generally the minimum speed at which product
can be saved).The second number is the (Turn Off) speed reached by the press
to be considered NOT running by P DAQ. If there is no second number, the
default is 50% of the cutoff (Turn On) speed. To invoke, enter the following
into the Pressman.ini file for each press:
Example: Press Cutoff Speed = 4000, 1000
Added Scale simulator. Ignore floor scale waste when in MR-1. Tare scale with discards.
Copyright 2001 - 2013 NASTech, Inc.